Sub-Enclosure No. 2 to Enclosure No. 1 in Despatch No. 302 of the 10th July, 1902.

599

Estimated cost of Kowloon Scheme, including Reservoir, Filter Beds, Mains, Service Reservoir, etc............... $835,000

Do. Do. of Pokfulam Scheme including Reservoir, Pumping Station and Machinery, Mains, etc., this is a mere guess at present.. $1,000,000

Do. Do. of Reservoir in progress at Tai Tam. $120,000

Projected Waterworks to be taken in hand now.

Pumping Engine and Main to Peak, say, $50,000 Reconstruction of No. 2 Tank, say, $20,000 Service Reservoir in progress on Mount Gough. $23,000 Introduction of Meters and Fountains in City, say, $133,000 Total $2,131,000

Several of the estimates given above are mere guesswork, but I think they may be regarded as minimum figures.

20th June, 1902.

(Sd.) W. Chatham.

Edit History

2026-06-01 10:19:59 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Sub-Enclosure No. 2 to Enclosure No. 1 in Despatch No. 302 of the 10th July, 1902. 599 Estimated cost of Kowloon Scheme, including Reservoir, Filter Beds, Mains, Service Reservoir, etc............... $835,000 Do. Do. of Pokfulam Scheme including Reservoir, Pumping Station and Machinery, Mains, etc., this is a mere guess at present.. $1,000,000 Do. Do. of Reservoir in progress at Tai Tam. $120,000 Projected Waterworks to be taken in hand now. Pumping Engine and Main to Peak, say, $50,000 Reconstruction of No. 2 Tank, say, $20,000 Service Reservoir in progress on Mount Gough. $23,000 Introduction of Meters and Fountains in City, say, $133,000 Total $2,131,000 Several of the estimates given above are mere guesswork, but I think they may be regarded as minimum figures. 20th June, 1902. (Sd.) W. Chatham.
Baseline (Original)
} ཧཱུྃ ÷ Sub-Enclosure No. 2 to Enclosure No. 1 in Despatch No. 302 of the 10th. July, 1902. 599 Satinated cost of Kowloon Scheme, including Reservoir, Filter Beds, Maina, Service Reservoir, ko............... $835,000 C Do. Do. of Faitas Tuk Scheme including Reservoir, Pumping Station and Machinery, Maina, đo., this is a mere guess at present..La .1,000,000 Do. Do. of Reservoir. in progress at Taitan. 120,000 Projected Waterworks to be taken in hand now. Pumping Engine and Main to Peak, say, Reconstruction of No. 2 Tank, say,............. Service Reservoir in progress. on Mount Gough.... Introduction of Meters and Fountains in City, say, 50,000 20,000 23,000 Total... ...................... 133,000 $2,131,000 Several of the estimates given above are mere guesswork, but I think they may be regarded as minimum figures. 20th. June, 1902. (Sd.) W. Chathau.
2026-06-01 10:19:59 · Baseline
View content

}

ཧཱུྃ

÷

Sub-Enclosure No. 2 to Enclosure No. 1 in Despatch No. 302 of the

10th. July, 1902.

599

Satinated cost of Kowloon Scheme, including Reservoir, Filter Beds, Maina, Service Reservoir, ko...............

$835,000

C

Do.

Do.

of Faitas Tuk Scheme including Reservoir, Pumping Station and Machinery, Maina, đo., this is a mere guess at present..La

.1,000,000

Do.

Do.

of Reservoir. in progress at

Taitan.

120,000

Projected Waterworks to be taken in hand now. Pumping Engine and Main to Peak, say, Reconstruction of No. 2 Tank, say,............. Service Reservoir in progress. on Mount Gough.... Introduction of Meters and Fountains in City, say,

50,000

20,000

23,000

Total...

...................... 133,000 $2,131,000

Several of the estimates given above are mere guesswork, but I think they may be regarded as minimum figures.

20th. June, 1902.

(Sd.) W. Chathau.